Skip to content
White shaker kitchen with quartz island in Raleigh

Request a quote

What to include in your message
  • Project type and areas (kitchen, bath, stairs, etc.)
  • Timeline or deadline
  • Photos, sketches, or a PDF if you have them
  • Any materials or project details you already know
0 / 4000 characters

Include: city, service, rooms or areas, timing, and photos if you have them.

Choose photos or PDF to upload Up to 10MB. Images or PDF.
Cabinet installation

Serving 30 mile radius around Raleigh and Durham. Kitchens are the work homeowners call us for most, and we bring the same planning and finish quality to bathrooms, stairs, floors, paint, repairs, and full-home updates.

Ideal for

  • Homeowners planning a full kitchen gut remodel
  • Cabinet refacing or replacement (stock, semi-custom, or custom)
  • Countertop upgrades: quartz, granite, marble, butcher block, solid surface
  • Kitchen layout changes involving plumbing, electrical, or structural work
  • New or redesigned islands with seating, sink, or cooktop
  • Aging-in-place or accessibility updates (lower counters, pull-out shelves)
  • Backsplash and flooring refresh with existing cabinets
  • Lighting and electrical upgrades: recessed, under-cabinet, pendant

How we deliver

  1. Initial call: goals, timeline, budget
  2. On-site measure: work triangle, cabinet and appliance placement
  3. Material selection: cabinet line, countertop, backsplash, flooring
  4. Written estimate: line items, allowances, schedule
  5. Demo & rough-in: dust containment, plumbing, electrical, structural
  6. Install: cabinet, countertop, backsplash, flooring
  7. Final walkthrough: trim, paint, fixtures, punch-list

Typical timeline

1–2 weeks for reface or counter-only; 6–10 weeks for full remodel (including cabinet and counter lead times)

Pricing

Varies by project — from targeted updates (countertops, backsplash) to full gut remodels.

  • Cabinet type and quantity: stock vs semi-custom vs custom; door style and finish
  • Countertop material and square footage: quartz, granite, marble, butcher block; edge profile
  • Layout changes: plumbing and electrical rough-in, structural work, permits
  • Island: size, cabinetry, optional sink and outlets
  • Backsplash and flooring: tile type and area
  • Appliances: we don’t sell them but coordinate connections and venting
  • Lighting: recessed, under-cabinet, pendant, and switching

Every project gets a detailed written estimate with line items before work begins.

Related services

You might also be interested in these services.

FAQs

Common questions about this service.

A reface or counter-only job can be 1–2 weeks. A full gut is typically 6–10 weeks once materials are on site; we build in lead times for cabinets (often 2–4 weeks) and countertops (1–3 weeks) so the full schedule is clear up front.

Yes. We identify when permits are required — usually for electrical, plumbing, or structural changes — and handle filing and inspections so your project stays compliant.

In most cases, yes. We use dust barriers and stage work to limit disruption. For a full gut, many clients set up a temporary kitchen elsewhere; we can discuss what works for your layout.

Yes. We guide you through cabinet lines and door styles, countertop materials and edges, backsplash and flooring, and fixtures — within your style and budget — and work with local and national suppliers.

We don’t sell appliances but we coordinate cutouts, electrical and gas connections, and venting. You purchase the range, refrigerator, dishwasher, etc.; we ensure everything fits and is correctly connected.

A written estimate with line items for cabinets, countertops, plumbing, electrical, tile, flooring, and labor. We call out allowances where you’ll make a final choice (e.g. faucet, tile) so there are no surprise add-ons.