Skip to content
Cabinet installation in progress

Request a quote

What to include in your message
  • Project type and areas (kitchen, bath, stairs, etc.)
  • Timeline or deadline
  • Photos, sketches, or a PDF if you have them
  • Any materials or project details you already know
0 / 4000 characters

Include: city, service, rooms or areas, timing, and photos if you have them.

Choose photos or PDF to upload Up to 10MB. Images or PDF.
Finished kitchen with cabinets

Serving 30 mile radius around Raleigh and Durham. Kitchens are the work homeowners call us for most, and we bring the same planning and finish quality to bathrooms, stairs, floors, paint, repairs, and full-home updates.

Ideal for

  • Full kitchen or bath cabinet replacement
  • Cabinet refacing when boxes are sound
  • Cabinet painting or stain refresh
  • Adding pull-outs, lazy Susans, or soft-close hinges
  • Island or vanity cabinet install

How we deliver

  1. Initial call: goals — new cabinets, reface, or refinish
  2. Walkthrough & measure: door style, finish, layout
  3. Quote: written estimate with options
  4. Order & schedule: cabinets or materials, install date
  5. Build: install, reface, or refinish; hardware and adjustments
  6. Final walkthrough: doors, drawers, alignment, punch-list

Typical timeline

Refinish 3–5 days; reface 5–7 days; full new install 1–2 weeks (after lead time for cabinets).

Pricing

Refinish $2,000–$5,000+; reface $4,000–$10,000+; new cabinets $5,000–$25,000+ depending on size and line.

  • Number of cabinets and linear footage
  • Stock vs semi-custom vs custom
  • Door style and finish (paint, stain, laminate)
  • Reface vs refinish vs full replacement
  • Hardware and organizational add-ons

We work with local and national cabinet suppliers and include labor in the estimate.

Related services

You might also be interested in these services.

FAQs

Common questions about this service.

Refinish = paint or stain existing doors and boxes. Reface = new doors and drawer fronts plus veneer on cabinet fronts. Replace = new cabinets throughout. We recommend based on condition and budget.

Yes. We can install cabinets and you can use existing countertops, or we coordinate with your countertop installer. We also do full kitchen and bath remodels.

Stock cabinets often 1–2 weeks; semi-custom 2–4 weeks; custom longer. We build that into the schedule and quote.